33 Parkside, Student Accommodation, Coventry

*CURRENTLY UNDER CONSTRUCTION Procured on a single stage Design and Build basis, this project is a multi storey development which will comprise of a basement and […]

Read more

Memoria Crematorium, Flintshire*

*CURRENTLY UNDER CONSTRUCTION A design and build contract for a new build crematorium on a greenfield site which contains overhead power lines and underground gas mains. […]

Read more

Oakapple Offices, Ilkley*

*CURRENTLY UNDER CONSTRUCTION This development comprises of a new 30,000 sqft office scheme with surface level car parking and built to a BREEAM Very Good standard. […]

Read more

Broughton Jewish Cassel Fox Primary School Phase 1*

*CURRENTLY UNDER CONSTRUCTION The scheme is the first of three planned phases in order to provide a first floor extension to a live Jewish school. The […]

Read more

Synagogue and Mikveh, Salford*

*CURRENTLY UNDER CONSTRUCTION D&B of a new three storey Synagogue & Mikvah with a mezzanine viewing gallery. The construction comprises a steel frame with an internal […]

Read more

Bridge Street Market, Warrington

Warrington Town Centre is undergoing a major redevelopment and CPUK have been appointed to undertake the first phase which comprises a new 25,500 sq ft retail […]

Read more

Civils | Solihull, Shirley*

*CURRENTLY UNDER CONSTRUCTION The works comprise of making arrangements with the appropriate authorities for disconnection of services and removal of fittings and equipment owned by those […]

Read more

Housing Units Distribution Centre, Hollinwood, Oldham

TThe scheme comprised of a 33,000sqft extension, incorporating an additional 12 bays to the existing Distribution Centre which remained operational 7 days a week. Construction consisted […]

Read more

Rhenus Logistics, New Headquarters, Manchester

This development utilised the combined skills of CPUK Construction and Civil Engineering. The Boysnope Wharf Warehouse and Infrastructure project comprised of the construction of a 50,000sqft […]

Read more

Civils | Aquila, Knowsley

The works comprised of the partial demolition and careful removal of an existing two storey office building, external wall to the north of the elevation and […]

Read more

Rock Oil, Warrington

The construction of a new 3 storey Research & Development Centre along with associated external works at Rock Oil’s current Headquarters in Warrington. The scheme has […]

Read more

Civils | Rhenus Logistics, New Headquarters, Manchester

Extensive Land Remediation & Soil Stabilisation to Mitigate Disposal & Import Cost at Rhenus Logistics New HQ, Manchester. CPUK Civils & Remediation have completed the remediation […]

Read more

Church Street, Wilmslow

The project involved the construction of a new three storey office building on a brownfield ‘infill’ plot of land in the commercial centre of Wilmslow. Site […]

Read more

Woodfield Road, Altrincham

This high spec design & build contract consisted of 32 apartments, built across two 4 storey buildings, and 9 town houses, developed for private sale. The […]

Read more

Cornerblock Offices, Manchester

The redevelopment of the Corner Block which is located in a prominent position in the heart of Manchester’s Central Business District fronting both Deansgate and Quay […]

Read more

Aldi, Hyndburn

Our works were undertaken on a live retail park and comprised of the demolition of an existing unit, along with the construction of a new build […]

Read more

Deasy Road, Coventry

Procured on a single stage D&B basis this multi storey building comprised of a new 155 bed student accommodation development. It’s of mixed construction with a […]

Read more

Bristol Road, Birmingham

Procured on a single stage D&B basis this multi storey building comprised of a new 103 bed student accommodation development. It’s of mixed construction with a […]

Read more

Grosvenor Estate, Windmill Shaft Remediation Works

CPUK tendered an outline scheme to be awarded preferred bidder status for the works, to support the client with detailed methodology and mine capping design to […]

Read more

Hardy Farm, Chorlton

The scheme involved the design and build of 28no timber frame executive houses with a mix of 3 and 4 bedrooms for First Step Housing. The […]

Read more

Aldi Squires Gate, Blackpool

This new build development took place on a live retail park on the outskirts of Blackpool. Before works commenced asbestos was removed from 5 existing units […]

Read more

No2 Moorfields, Liverpool

This 1970’s building has a part listed façade and is located in the heart of Liverpool’s commercial centre and conservation area on Dale Street.  Our works included […]

Read more

Hahnemann Building, Liverpool

The project comprised of the redevelopment of Hope Street’s historic, Grade II-listed Hahnemann Building into 100 modern technology driven, student studios. On completion, the former Hahnemann […]

Read more

Aldcliffe Road, Lancaster

The scheme involved the design and build of 14 dwellings in a conservation area, 8no new build and the repair and conversion of the existing Grade […]

Read more

Walshaw Care Home, Bury

A new build, 3 storey, 56 bed care facility constructed within the grounds of the existing Walshaw Hall Care Home.  Prior to construction commencing we had […]

Read more

Civils | Charles Street, Stockport

The works at Charles Street Stockport consisted of the demolition of existing bus depot and associated warehouses and Remediation and re-engineering of the existing brownfield site […]

Read more

Selly Oak, Birmingham

A negotiated project to deliver a fully fitted out student accommodation development for 329 en-suite rooms across six buildings in a combination of 2 and 3 […]

Read more

Cardinal Court, Oldham*

*CURRENTLY UNDER CONSTRUCTION This project was awarded through negotiation and a collaborative approach to ensure that this fast track development could commence on site in the […]

Read more

Oldgate House, Huddersfield

A demanding design and build contract which comprised of the major conversion and remodeling of a 1970s office building into 9 storey student accommodation, together with […]

Read more

Pantheon Park, Wolverhampton

The demolition works for Pantheon Park involved dismantling two large steel frame portal sheds, previously used in steel fabrication which contained significant asbestos materials along with […]

Read more

Venture Point, Speke

The construction of four industrial units with a collective square footage of 78,500sqft. The site is adjacent a busy rail line which will necessitate a close […]

Read more

Riverside, Salford

A £7 million negotiated Design and Build in Salford for a new 5 storey; 242 bed student accommodation development of which 15 have disabled access. The […]

Read more

Apex Centre, Water St, Bury

A new build retail development of 3 units for Tesco Express, Subway and KFC. The project comprises the construction of a new single storey steel framed […]

Read more

Arts, Design & Performance Facility, UCLAN, Preston

The design and build of a new arts, design and performance centre for the University of Central Lancashire. The redevelopment was undertaken on the live university […]

Read more

Lingley Mere, Warrington

Design and build of a single storey amenity building. The new facility covering 7,500sqft incorporates a restaurant, coffee bar and convenience store and is situated in […]

Read more

N S & I Building, Blackpool

The contract includes the complete reconfiguration and refurbishment of the existing Moorland Building (whilst maintainging full operation of the existing communications room) and provision of a […]

Read more

Sedgley Gardens, George Street, Prestwich

Design and Build mixed use scheme comprising basement car park, basement and ground floor retail space with 24 apartments above. The site is bordered by major […]

Read more

St Nicholas Gate Retail Park, Carlisle

A Design and Build contract working in a live environment to construct a new retail unit of approximately 5,475sqft and the refurbishment and amalgamation of two […]

Read more

Spindle Cottage, Prestbury

Spindle Cottage is CPUK’s third scheme for Scott Developments. This negotiated project provides a single luxury dwelling comprising 5 bedroom / 3 bathroom accommodation. The quality […]

Read more

Redlands, Prestbury

A 5,000 sq ft dwelling in Prestbury which offers luxury accommodation. The main shell comprises loadbearing masonry with precast concrete upper floors, external wall finishes include […]

Read more

Liverpool Community Health Care NHS, Walk In Centre

This new facility allows separate services which were located across the city of Liverpool to be housed in one central location. Our works took place in […]

Read more

The Room, Lawson Street, Preston

The scheme is built in the very heart of Preston City centre and provides 85 No one and two bedroom apartments including basement parking over seven […]

Read more

Partington Village Retail Centre

The project offers circa 27,000 square feet of retail space. It began with the removal of asbestos, demolition of an existing building and vibro piling of […]

Read more

Frankie & Benny’s, Blackburn

The Project comprises the construction of 25,000 sq ft new build retail space and the alteration and refurbishment of 20,000 sq ft of existing space at […]

Read more

Centre 4 Independent Living, Knowsley

The works consist of the refurbishment of an existing industrial unit/ offices. Alterations will be made to the existing structure to form new two storey office […]

Read more

The Edge, Hoghton Street, Southport

25 City Centre apartments in the heart of Southport with a mixture of 1, 2 and 3 bedrooms all with balconies and/or roof terraces with integral […]

Read more

Singleton Road, Salford

This development is located within the Greater Manchester Jewish Community in a built up residential area and adjacent to a synagogue, as a result our construction […]

Read more

Starbucks Drive Thru, Trafford Park, Manchester

The construction of the Starbucks Drive Thru comprises of the erection and completion of a shell building for future fitting out by the tenant. The building […]

Read more

St Peters RC High School, Religious Education Centre, Belle Vue

A traditional project to construct a new Religious Education Centre, the single storey building will provide of an entrance lobby, classrooms, chapel, sanctuary, sacristy, unisex toilets […]

Read more

Digital Park, Pacific Quay, Salford

Digital Park represents the first of the Peel Business Space concept Projects. The intention is to roll out the product across the North West and beyond […]

Read more

Easyspace, Ellesmere Port

The scheme comprised the provision of over 32,000 sq ft of office/warehouse space. The steel framed buildings sat on simple pad/beam foundations following extensive earthworks inlcuding […]

Read more

Orban, Whalley Range, Manchester

Negotiated Design and Build scheme with Crosby Lend Lease to provide 24 No 2 bedroom luxury apartments. The structure comprised traditional strip footings with load-bearing masonry […]

Read more

The Bakestones, Delph, Oldham

The new development is set on the reclaimed Brownfield site. The works consisted of the construction of 46 new stylish residential properties. The houses are of […]

Read more

Private Development, Knutsford

This project was set in a conservation area on a 14,000sqft prestigious dwelling in Knutsford. The works consisted of the full refurbishment of an existing 7,000sqft […]

Read more

Littledales Park, Hartford

Negotiated Design and Build scheme to provide 21 luxury houses, 8 new build apartments and the complete refurbishment and extension of 19th century Sandiway Cottage to […]

Read more

Mosley Road, Trafford Park, Manchester

The construction of 2 warehouses and incorporated offices with a combined square footage of 113,250sqft . Unit one consists of 32,280sqft of warehousing together with 5,450sqft […]

Read more

Olivers Place, Fulwood

The scheme comprises the construction of 4, two storey office blocks (40,000 sq ft total) and a single 80,000 sq ft warehouse with associated offices. The […]

Read more

Olivers Place, Fulwood

The scheme comprised of the construction of 4, 2 storey office blocks (40,000 sq ft total) and a single 80,000 sq ft warehouse with associated offices. […]

Read more

Cathedral House, Salford

Cathedral House is a Grade II listed building. Our works were undertaken in a live environment and involved the re-development and refurbishment of the existing facility […]

Read more

Spire Hospital Endoscopy Unit, Warrington

The scheme consisted of a 2 Storey extension with associated internal alterations to accommodate an administration area on the ground floor, along with an endoscopy suite […]

Read more

Co-Operative Funeral Parlour, Oldham

A design and build project involving the relocation of the funeral parlour due to the expansion of the Manchester Metrolink. This was a fastrack development involving […]

Read more

Loreto 6th Form College, Manchester

Construction of a new modern standalone 6th form centre (maths & science theory facility) at Loreto College. The works comprised of a three storey, structural steel […]

Read more

Castle Retail Park, Penrith

The works comprised the construction of 5 Nr single storey steel framed and metal clad retail units totalling 4,738m2 (51,000ft2) constructed to shell specification, together with […]

Read more

Swan House, New Cheshire Business Park, Northwich

Negotiated project which represents our third Project with Chantry Developments comprises the construction of approximately 18,500ft2 of warehouse space and associated 2 storey offices. Extensive value […]

Read more

Cygnet, Swan House, New Cheshire Business Park

Negotiated project which represents our third Project with Chantry Developments comprises the construction of approximately 18,500ft2 of warehouse space and associated 2 storey offices. Extensive value […]

Read more

New South Stand, Preston North End

This scheme comprised the demolition of the existing stand to provide a new £3 million South Stand at Preston North End Football Club, including all safety […]

Read more

Ennerdale Road, Formby

Cedar Point, Ennerdale Road is a luxury development in Formby of 3 and 4 bedroomed homes, on a site which was previously a Service Station. The […]

Read more

Cygnet Phase 1

The completion of the design and construction of a new manufacturing/storage/office complex for the Cygnet group. The project consisted of a new high bay warehouse facility […]

Read more

Jubilee Park Pavilion, Liverpool

This scheme at Jubilee Park in Huyton consisted of the refurbishment of an existing community building comprising pavilion and changing room facilities. The scheme was part […]

Read more

The Park Medical Centre, Cottam Lane

CPUK have recently completed Cottam Lane Medical Centre which provides a 3 storey traditionally built building incorporating 11 consulting rooms, 2 practice nurse rooms, a minor […]

Read more

The Gallery, Whalley Range

A key factor in the development of this site to provide 24 luxury apartments was the clients requirement to retain the original facade to the existing […]

Read more

Wellfield Health Centre, Rochdale

A design and build project which was constructed to a BREEAM Excellent standard. This new state of the art medical centre provides a 2 storey traditionally […]

Read more

Straiton Retail Park, Edinburgh

Our works were undertaken in a live retail park and comprise the construction of a new build 10,000sqft steel frame unit with a lower ground floor. […]

Read more

Pontville School, Ormskirk

Pontville School is an independent residential and specialist day school in Lancashire, providing high quality education and care for children between the ages of 5 and 19.  The […]

Read more

Manchester Education Centre

CPUK Ltd have completed this prestigious development in a very prominent location in Manchester city centre. This 5 storey development provides our customer with an education […]

Read more

Greenmoss Medical Centre, Scholar Green

This design and build project involved the demolition of an existing dwelling along with associated farm buildings to accommodate the construction of a new 1100m2, two […]

Read more

Samurai Judo Hall, Warrington

Design and build scheme to provide a new judo hall facility comprising a steel portal frame with blockwork/ facing brickwork external envelope and tiled roof. Due […]

Read more

Costa Coffee, Sheffield

The design and construction of a 1500sqft single storey retail unit for future use by Costa Coffee. The scope of our works was to complete the […]

Read more

Shelly Ward, Ashworth Hospital

Due to the successful completion of a previous project for Mersey Care NHS Trust we were able to demonstrate that we had the necessary skills, knowledge […]

Read more

Torkington Road, Hazel Grove

A design and build project which involved the construction of a new 2 storey, 48 bed care home following demolition of an existing building and the […]

Read more

St Peter’s Church Hall & Community Centre, Sandbach

The project was to construct a new Church Hall and Community Centre. The completed centre provides adult education/church facilities, after school clubs and other community activities. […]

Read more

Costa Coffee, Bolton

Design and build of a single storey Costa Coffee with an approximate 1500sqft internal floor area. The scope of our works was to complete the shell […]

Read more

Scott Clinic, Step Down Unit, Rainhill

This project was undertaken in a live environment. The scheme consisted of the construction of a new small single storey flat roof reception and office, together […]

Read more

Costa Coffee, Chester

This project was the first for Threadneedle Property Services that CPUK have undertaken. The scheme consisted of the Design and Construction of a new detached drive […]

Read more

Springhill Care Home, Accrington

This project was developed using the Sterling University gold standard principles. The works consisted of the construction of a 3 Storey 46 bedroom extension to the […]

Read more

Birch Abbey Care Home, Southport

The design and build of a new 60 bedroom specialist care home for people living with dementia. This was a challenging project on a very restricted […]

Read more

Sainsburys Local, Blackpool

This is our second successful retail development for Windmill Holdings and the professional team. The project involved the construction of a 5,000sqft two storey retail unit […]

Read more

Chelford Green, Chelford

Design and Build scheme comprising the construction of 20 luxury apartments. Site access was severely restricted and full public access was required to the adjacent market […]

Read more

Working with and for CPUK will be a pleasure!